“Północna” Shopping Mall, Warsaw

Comprehensive execution of power-current electrical installations, including external MV grid , cable routes, power and lighting installations,  appliances of delivery-collection point transformer station, installation of electrical switchboards.    

Żydowo pumped storage plant – power output replacement

Comprehensive  execution of 110 kV HV cable line. Modernization of HV 110 kV line connections , including the dismantling of existing connections, suspending and connecting new ones between the hydrogenerators and […]

Korytnica Wind Farm

400 kV power evacuation. Second longest 400 kV cable line in Poland, 400/110 kV and 110/30 kV substations.  

“Rudna” copper mine – modernisation of a 110/10 kV switchgear and installation of a trigeneration system

110/10 kV switchgear modernisation, electrical and low voltage installations, automation and control system within the construction of a surface air-conditioning station and power generation unit. Production of design documentation for […]

110 kV switching station of the 220/110/20 kV Substation in Świebodzice (GIS) – modernisation without interruption

General Contractor of the non-interrupted modernisation of the 220/110/20 kV substation involving: production of the execution plan, construction of a three-storey building for the 110 kV switchgear, supply and installation […]

Banie-Kozielice Wind Farm

220 kV power evacuation. Longest 220 kV cable line in Poland. 220/110 kV substation and 110/33 kV substation

Krywiatycze Wind Farm (15 MW)

Full completion of the wind farm (BoP), including: construction of wind turbine foundations, electrical substation and cable network, building and adjusting local roads, supply and installation of measurement and telecommunication […]

Topczykały Wind Farm (22,5 MW)

Full completion of the wind farm (BoP), including: construction of wind turbine foundations, electrical substation and cable network, building and adjusting local roads, supply and installation of measurement and telecommunication […]

Gdańsk-Błonia – Construction and modernisation of a 110 kV switchgear (7 bays)

Construction and modernisation of seven 110 kV bays in terms of power-system automation and telemechanics.

RPZ4 Białystok – comprehensive modernisation of a 110/15 kV district supply substation

Comprehensive modernisation of a 110/15 kV substation involving primary and secondary circuits, and auxiliaries, including necessary construction works (foundations, building remodelling, land development, etc.).

Rajgród Wind Farm (25.3 MW)

General Contractor of energy works including construction of a HV/MV substation, HV cable line, MV and fibre wire lines, creation and start-up of telecommunications systems.

Gawłowice Wind Farm (41.4 MW)

General Contractor of energy works including construction of a HV/MV substation, MV and fibre wire lines, creation and start-up of telecommunications systems.

L’Oréal production plant in Kanie – expansion

Execution of electrical and teletechnical installations, HVAC and BMS automation systems, and lighting control for the expansion of the production plant of Kosmepol sp. z o.o. (L’Oréal) in Kanie.

Vilnus, Lithuania: Sicor Biotech UAB pharmaceutical plant – expansion

Execution of electrical and teletechnical installations, HVAC, BMS, and EMS automation systems, supply of a power generator and UPS (flywheel UPS).

Podlasie Opera and Philharmonic in Białystok

Comprehensive design, execution and start-up of low voltage installations, HVAC and BMS automation systems.

Uniqua Forum in Warsaw

Comprehensive design, execution and start-up of networks and electrical installations, low voltage circuits, HVAC and BMS automation systems.

Teatr Powszechny theatre in Warsaw

Comprehensive execution and start-up of networks and electrical installations, including low voltage systems, scene lighting and projector.

Galeria M in Białystok

Comprehensive design, execution and start-up of networks and electrical installations and low voltage systems.

Auchan in Białystok

Comprehensive design, execution and start-up of the power network and electrical installations.  

Canal+ Building in Warsaw

Comprehensive design, execution and start-up of networks and electrical installations, SAP system, HVAC and BMS/RMS automation systems.

Rondo 1 office building in Warsaw

Comprehensive execution of HVAC and BMS automation systems.

District Court and District Prosecutor’s offices in Białystok

Comprehensive execution of external networks, electrical installations in buildings A and B.

Blue City shopping Centre in Warsaw

Comprehensive execution of HVAC and BMS automation systems.

Other

Siemianówka Water Reservoir – renovation of electrical installations

Renovation of ROD switchgears, UPS guaranteed voltage system, integration of existing alarm systems with PLCs and installation of CCTV,  replacing a section of overhead and cable line.  

Poniec Wind Farm (21 MW)

Connecting the wind farm into Enea Operator power grid.

Tyszowce Wind Farm

110/30 kV substation, 110 kV cable line with a detailed construction design of the 110 kV bay in a PGE Dystrybucja S.A. substation.

Tomaszów Wind Farm

110 kV cable line with a detailed construction design of the 110 kV bay in a PGE Dystrybucja S.A. substation.

Suchań Wind Farm

110/20 kV substation and green energy measuring systems in the WTGs.

Wróblew Wind Farm (38 MW) grid connection

Comprehensive completion of an energy substation necessary to connect the Wróblew Wind Farm to the grid. Modernisation of the overhead Jawor-Błaszki 110 kV substation. Comprehensive modernisation of energy protection systems […]

Skurpie Wind Farm (36.8 MW)

General Contractor of energy works including construction of a HV/MV substation, HV cable line, MV and fibre wire lines, creation and start-up of telecommunications systems.

Białousy – energy management system (EMS implementation)

Measuring and data processing system, covering a compound of cold stores and greenhouses was installed in a berry plantation. Installing the system along with EMS brought a significant reduction of […]

Nowy Tomyśl – energy management system (EMS implementation)

Measuring and data processing system, covering the production lines, was installed in an industrial plant. Installation of the system along with EMS brought a reduction of costs associated with the […]

Długołęka – energy management system (EMS implementation)

Measuring and data processing system was installed in the office building. Installing the system along with EMS brought reduction of the costs associated with excessive energy usage generated by office […]

Biała Piska 110 MV District Supply Point substation modernisation

Comprehensive modernisation of the telemechanics system in the HV/MV substation.

Design for the 110 /15 kV Rzeszów Dworzysko substation and 110 kV supply lines.

Development of a construction design and provision of all necessary decisions, opinions and permits, including the final building permit. Development of detailed construction designs necessary to properly carry out the […]