Electrum to develop “Rudna” mining plant

Electrum will develop and modernize the “Rudna” mining plant – one of the key facilities in Polish copper deposit.

The works will include modernization of 110/10kV switchgear, construction of power and low-voltage installations as well as as automation and control systems contained in surface central air conditioning station and power generators station. Electrum is also the author of the design documentation in the above range.

The development of “Rudna” will begin in August 2014, its completion is scheduled for the second half of 2015.