Piecki Wind Farm (32 MW)

Comprehensive construction of a 110/20 kV substation. Reconstruction of the 110 kV line and cable lead-ins into the substation. Design, execution and start-up of a connectivity system with PSE Operator S.A. and PGE Dystrybucja S.A. Białystok Unit. Design, supply and start-up of green energy measurement systems in 16 WTGs, along with the supply, installation and start-up of the complete measurement system. Conduction of compliance tests on the Wind Farm, in accordance with IRiESD requirements (Polish Distribution Grid Code), includig the so called energy quality tests.

Skills

Posted on

December 29, 2015