Żydowo pumped storage plant – power output replacement

Żydowo pumped storage plant – power output replacement

Comprehensive  execution of 110 kV HV cable line. Modernization of HV 110 kV line connections , including the dismantling of existing connections, suspending and connecting new ones between the hydrogenerators and overhead poles, testing and commissioning. Replacing...
Korytnica Wind Farm

Korytnica Wind Farm

400 kV power evacuation. Second longest 400 kV cable line in Poland, 400/110 kV and 110/30 kV substations.