GEPOL Solar farm

In 2019–2020, the Electrum Group completed the electrical infrastructure for connecting 55 solar farms with a total capacity of 55 MWp and created a microgrid for 10 households powered by a smart MV network. Our tasks included variable building design, complete execution designs, and the construction of a 20/110 kV GPO substation, 13.5 km of 110 kV cable lines, 25 km of cable networks, and 10.5 km of dual-circuit lines. We also provided a SCADA system with monitoring of inverters and trackers, and conducted comprehensive testing, measurements, and commissioning.

The scope of our design and administrative work included:

  • Development of alternative construction designs,
  • Preparation of complete executive designs,
  • Coordination of designs with Tauron Dystrybucja S.A..

The execution and logistical tasks included:

  • Delivery, installation, and commissioning of the tracker structure and system,
  • Delivery, installation, and commissioning of inverters, transformer stations, summators, grounding systems, and transformers,
  • Delivery and implementation of a complete SCADA system with monitoring of inverters and trackers,
  • Construction, road, and land works,
  • Comprehensive low and medium-voltage cabling works.

Investor:

GEPOL DYSTRYBUCJA

Investment date:

2019-2020