Krasin Wind Farm – 30 MW
As part of the implementation of the 30 MW Krasin Wind Farm, Electrum Group was responsible for comprehensive construction works on the Krasin HV/MV substation (110/30 kV) and the overhead-cable high-voltage line. Key tasks included the development and execution of the revised construction design, obtaining the Building Permit Decision for both the Krasin substation and the HV overhead-cable line, as well as commissioning the wind farm and securing the Permit for Use.