Kosmepol Loreal Kanie 2015

The next stage of modernization and expansion of the Kosmepol plant (L’Oréal Group) in Kanie was carried out by Electrum Group between February 2015 and April 2016.

Our scope of work included the construction of a power supply line for MCC 14, visualization of the Water Treatment Station (700 IO), ventilation unit (50 IO), modification of the existing AHU05 ventilation unit, and expansion of existing switchboards (TSE04A-1, PGNN L2, RGNN L1).

We provided system licenses, lighting fixtures, and cable trays along with installation. Electrical system measurements were also performed.

Investor:

Kosmepol sp. z o.o. (L’Oréal) w Kaniach

Investment date:

2015-2016

Skip to content